| Water Taxi Repair Job
A wooden pile ripped open the side of a water taxi when the motor stalled and the current in the Hudson River took the boat. This was a big job that had to be done quick so the taxi could get back into service. I worked 16-hour days for eleven days straight to get the job done. The Coast Guard was inspecting the repairs throughout the whole repair process. In the end they to where very impressed with my work. To get things going and be able to put the hours in, I had a frame built around the damaged area and then I enclosed the area with Shrink Wrap. I did this in case it started to rain so my work would be protected. I then brought in all of my scaffolds, table saw, air compressor, cutting tables, fiberglass materials and setup a temporary shop. It worked out great and the job was done successfully and on time! Check out the photos and you be the judge.
|